Gazetted notices
The following table will be updated with copies of notices that establish a Petroleum or Greenhouse Gas Safety Zone (PSZ or GGSZ) as they are published in the gazette. Notices will remain available as a link via the table until expiry or by a revocation notice published in the Gazette.
Please note the table includes notices that were issued by the relevant state and Northern Territory designated authority prior to 1/1/2012; at which time NOPSEMA became responsible under the Offshore Petroleum and Greenhouse Gas Storage Act 2006 (the OPGGS Act) for the administration of PSZs. NOPSEMA is in no way responsible for the detail contained therein.
In conjunction with titleholders, NOPSEMA has endeavoured to identify all established safety zones and to the best of its knowledge believes the following table of safety zone Gazettals to be current and in force. However, should you have records of gazetted safety zones that do not appear in the table, that you believe to be current and in force and that have neither expired or been revoked by a notice in the gazette, please contact NOPSEMA at safetyzones@nopsema.gov.au to discuss.
Current notices
Title | Well(s), Structure(s) and/or Equipment | Type of notice | Valid from | Valid to | Gazettal Notice |
---|---|---|---|---|---|
WA-5-L | Goodwyn A Platform | PSZ | 28/11/2016 | until revoked | A525466.pdf |
WA-49-L | Brunello Production manifold, Crossover Manifold and BRUA-2a, BRUA-3, BRUA-4, BRUA-5 and BRUA-6 production wells | PSZ | 02/10/2017 | until revoked | A572101.pdf |
WA-49-L | Balnaves wells BAL-5H, BAL-6H, BAL-7WI & BAL-8GI | PSZ | 08/05/2017 | until revoked | A550101.pdf |
WA-44-L | Turret, riser base manifold & moorings, Drill centre 1P | PSZ | 01/10/2015 | until revoked | A441884.pdf |
WA-42-L | Pyrenees Venture FPSO and internal Turret | PSZ | 31/12/2009 | until revoked | A267930.pdf |
WA-42-L | MAC-07, MAC-08, MAC-09, MAC-10 | PSZ | 01/07/2013 | until revoked | A296248.pdf |
WA-36-L, WA-37-L & WA-39-L | Gorgon GMT midline pipeline termination structure, Jansz umbilical midline connection assembly, and Gorgon M1, Gorgon M2 and Gorgon M3 wells | PSZ | 19/06/2017 | until revoked | A556034.pdf |
WA-33-L | Blacktip Wellhead Platform (PLATFORM) and Blacktip Pipeline Spool Bend | PSZ | 10/07/2009 | until revoked | A267917.pdf |
WA-33-L | ENI Blacktip Gas Project | PSZ | 01/07/2009 | until revoked | A241099.pdf |
WA-32-L | Spider Buoy for Stybarrow Venture MV16 FPSO plus Hawser plus Offtake Tanker, Stybarrow Drill Centre A wells 12&13, Stybarrow Drill Centre B wells H3, H4 & I1, Stybarrow Drill Centre C Wells H1 & H2, Eskdale Drill Centre D Wells EGI&EH1 and associated flow | PSZ | 26/10/2007 | until revoked | A270969-and-A555747.pdf |